Defence: Submarines (Question No. 1600)
David Johnston (WA, Liberal Party, Shadow Minister for Defence) Share this | Link to this | Hansard source
asked the Minister representing the Minister for Defence, upon notice, on 5 March 2012:
For the period 1 July to 31 December 2011, which submarines were undergoing maintenance / refit programs and for what length of time.
Chris Evans (WA, Australian Labor Party, Leader of the Government in the Senate) Share this | Link to this | Hansard source
The Minister for Defence has provided the following answer to the honourable senator's question:
Over the period 1 July to 31 December 2011, submarines undergoing maintenance / refit programs were as follows:
(i) HMAS Collins was completing a planned certification extension docking, which concluded on 18 August 2011. The submarine continued unscheduled maintenance until 21 October 2011.
(ii) HMAS Farncomb commenced a planned intermediate maintenance availability on 16 November 2011, which was ongoing for the remainder of the period.
(iii) HMAS Waller commenced a planned mid-cycle docking on 13 September 2011, which was ongoing for the remainder of the period. From 4 July to 13 September 2011, Waller was conducting mid cycle docking preparations.
(iv) HMAS Dechaineux conducted unscheduled maintenance from 5 to 9 August 2011.
(v) HMAS Sheean was conducting a planned full cycle docking throughout.
(vi) HMAS Rankin was conducting a planned full cycle docking throughout.